Your plant needs pipe that passes x-ray. Code work, not hack work. We run ASME procedures, qualify our welders on the actual WPS, and document everything. Refineries, chemical plants, power generation—we've worked them all across Louisiana's industrial corridors.
Pipe welding in Louisiana runs $12–$35 per diameter-inch for carbon steel field work. Stainless is $20–$65 per dia-inch. A 6-inch Schedule 40 carbon weld? About $72–$210 depending on position and access. Shop fab runs 20-30% less. We quote by the weld count—send your isometrics for real numbers in 3-5 days.
Fill out the form and our team will review your project and respond with pricing, lead time, and any questions — typically within one business day.
Get pricing and availability within 24 hours
Nobody wants to quote pipe welding over the phone. "It depends." True—but you deserve a starting point. Here's what we've charged on actual Louisiana projects in the past year. These are field welding rates; shop fab is 20-30% less.
| Material | Field Rate (per dia-inch) | 6" Sch 40 Butt Weld |
|---|---|---|
| Carbon Steel (A106/A53) | $12 – $35 | $72 – $210 |
| 304/316 Stainless | $20 – $65 | $120 – $390 |
| Chrome-Moly (P11/P22) | $35 – $85 | $210 – $510 |
| Duplex Stainless | $40 – $90 | $240 – $540 |
| Inconel / Hastelloy | $60 – $150+ | $360 – $900+ |
| Sanitary (316L Orbital) | $50 – $100 | $300 – $600 |
Rates vary by position, access, testing requirements, and job size. Shop fabrication 20-30% less than field rates. January 2025 pricing.
From P&ID to pressure test. We fab it, weld it, install it, test it. One contractor, one responsibility.
Shop-fabricated spools delivered ready to install. Cut, bevel, fit, weld, NDE—all before it leaves our shop. Tagged by system, staged by install sequence.
ASME qualified welders on every procedure we run. SMAW, GTAW, FCAW—whatever the WPS calls for. X-ray quality is the baseline, not the exception.
Our crews install what we fabricate. Rigging, fit-up, field welds, tie-ins. We coordinate with your other trades and work your schedule—including nights and weekends.
Food, beverage, pharma—we do 3A sanitary work. Orbital welding for consistent purge. Interior bead inspection. Documentation that satisfies your auditors.
Hydrostatic and pneumatic testing per spec. We coordinate RT, PT, MT through qualified NDE contractors. Test packs assembled for your records.
Leaks happen. Corrosion happens. We do emergency repairs and planned replacements. Hot taps and line stops when you can't shut down.
Here's what happens after you send us your P&IDs and isometrics.
We count welds, spec materials, estimate hours. You get a detailed quote with weld count, material allowance, and labor breakdown.
Spools fabricated in our shop. Fit-up, tack, root, fill, cap. NDE before it ships. Every spool tagged and tracked.
Our crews install the spools. Rigging, supports, tie-ins. Field welds done to same standard as shop work.
Pressure test per spec. Punch list cleared. Documentation package delivered. System ready for commissioning.
Process piping for the facilities that keep Louisiana running.
Qualified procedures for carbon steel through exotic alloys.
A106, A53, A333 for general process and utility service.
P11, P22, P91 for high-temperature refinery and power.
304, 316, 321, 347 for corrosive and sanitary service.
2205, 2507 for offshore, chemical, seawater.
Inconel 625, 825, Monel 400 for extreme conditions.
C-276, C-22, B-2 for severe chemical environments.
Qualified procedures for ASME, API, and client specifications.
Governing code for chemical and petroleum piping.
Power plant steam, feedwater, and auxiliary piping.
Welder and procedure qualifications.
Pharmaceutical and semiconductor applications.
Complete piping services from isometric takeoff through hydrostatic testing.
Isometric review, material takeoff, fabrication planning.
Pipe spool prefabrication in controlled environment.
In-process and final inspection. NDE as required.
Rigging, fit-up, and field welding.
Hydrostatic testing and documentation.
Process piping for demanding industrial environments.
Process piping for crude units, FCC, cokers, hydrotreaters.
Corrosion-resistant piping. Exotic alloys for severe service.
Main steam, feedwater, auxiliary. ASME B31.1 qualified.
High-purity piping. ASME BPE compliant orbital welding.
Sanitary piping for food processing. 3-A compliant.
Digesters, recovery boilers, chemical systems.
New Orleans corridor, Gulf Coast operations. High-temp, high-pressure service. Chrome-moly, stainless, alloy. Turnaround support with scaled crews.
Decatur industrial corridor and beyond. Corrosive service, exotic alloys, sanitary requirements. We match the material to the process.
Louisiana Power plants, combined cycle, co-gen. Steam piping, condensate, feedwater. B31.1 code compliance. Outage and maintenance support.
Breweries, dairy, food processing. Sanitary 316L, orbital welding, 3A compliance. Clean welds that pass inspection and keep your product safe.
Huntsville area biotech, pharma manufacturing. High-purity piping, ASME BPE, documentation that satisfies FDA auditors.
Recovery boilers, digesters, bleach plants. High-temp, corrosive environments. Stainless overlays, alloy replacements.
Qualified procedures for every material. Welders tested on each WPS they'll run.
$12–$35 per dia-inch for carbon steel field work. $20–$65 for stainless. A 6" carbon weld runs $72–$210. Shop fab is 20-30% less. Alloys cost more. Send drawings for a real quote.
B31.1 and B31.3. B31.1 for power piping—steam, boilers. B31.3 for process piping—refineries, chemical plants. All welders qualified per Section IX with documented continuity.
That's the baseline, not the exception. Our welders are qualified to RT-quality standards. We coordinate NDE through qualified third parties and keep repair rates low because we do it right the first time.
Yes. 304/316 stainless, duplex, chrome-moly (P11, P22, P91), Inconel, Hastelloy, Monel. TIG, orbital, and stick depending on the WPS. Welders qualified on each material/process combination.
Absolutely. We scale crews for turnaround work. Pre-fab spools before the outage to minimize tie-in time. 24/7 coverage, multiple shifts, whatever your schedule requires.
Yes. 316L sanitary tube and fittings. Orbital welding for consistent ID beads. Borescope inspection. Documentation for 3A and ASME BPE compliance. Dairy, brewery, pharma—we've done it.
3-5 business days for standard projects. Send your isometrics and we'll count welds, spec materials, and give you a detailed breakdown. Budget numbers faster if you're in a hurry.
Yes. Hydrostatic and pneumatic testing per your spec. We coordinate RT, PT, MT through qualified NDE contractors. Test packages assembled with all documentation for turnover.
Send your drawings. We'll give you a detailed quote with weld count, materials, and labor—not a guess.